Changes

Jump to navigation Jump to search
Line 137: Line 137:     
==== Startup ====
 
==== Startup ====
 +
*Connect the pneumatic air line located on the tool holder end of the machine.
 +
*To power up the machine turn on the main power switch located on the base of the control panel.
 +
*Turn on the key switch located near the screen located on the control panel and wait for the PC to boot.
 +
*Make sure all of the axis are clear to move.
 +
*Select HOME and wait for the machine to move to the 0,0 position. Make sure you are located behind the yellow tape on the floor.
    
==== Material ====
 
==== Material ====
1,956

edits

Navigation menu