Changes

Jump to navigation Jump to search
no edit summary
Line 5: Line 5:  
   |Is facility=True
 
   |Is facility=True
 
   |Has ace=Shane Case; scase16@georgefox.edu
 
   |Has ace=Shane Case; scase16@georgefox.edu
   |Has certification=https://foxtale.georgefox.edu/moodle/course/view.php?id=31715
+
   |Has certification=https://georgefox.instructure.com/courses/1299
 
}}
 
}}
   Line 94: Line 94:  
The printer materials and acrylic located in the room should only be removed by Machine Shop and Prototype Lab staff. There are also items hanging on the cage wall.  These items should only be removed when  checked out.   
 
The printer materials and acrylic located in the room should only be removed by Machine Shop and Prototype Lab staff. There are also items hanging on the cage wall.  These items should only be removed when  checked out.   
   −
== Foxtale Certification ==
+
== Canvas Certification ==
Before working with any of the equipment in the Vault you will need to take the [https://foxtale.georgefox.edu/moodle/course/view.php?id=31715 general lab quiz] as well as the specific quiz for each machine you are trying to use. The enrollment code for all of the quizzes is MakerHub.
+
Before working with any of the equipment in the Vault you will need to take the [https://georgefox.instructure.com/courses/1299 general lab quiz] as well as the specific quiz for each machine you are trying to use. The enrollment code for all of the quizzes is MakerHub.
    
<!-->
 
<!-->
148

edits

Navigation menu