Changes

Jump to navigation Jump to search
Line 155: Line 155:  
11. Make sure the pressure relief handle has been turned clockwise to allow pressure to build.   
 
11. Make sure the pressure relief handle has been turned clockwise to allow pressure to build.   
   −
12. Insert the pump handle into the handle socket.
+
12. Insert the pump handle into the handle socket.
   −
13. Slowly cycle the handle while watching the force gauge and the pin. Make sure the pin is starting to move.
+
13. Center the extraction tool with the end of the dowel pin to be removed. 
 +
 
 +
13. Slowly cycle the handle while watching the force gauge and the dowel pin. Make sure the pin is starting to move.
    
[[File:HP Step 9.jpg|none|thumb]]   
 
[[File:HP Step 9.jpg|none|thumb]]   
1,956

edits

Navigation menu